Project |
|
Year |
Client |
|
|
|
|
|
 |
|
|
2013 |
Nexans |
 |
|
|
2012 |
Buksér og Berging |
 |
|
|
2012 |
Technip |
 |
|
|
2012 |
Wärtsilä |
 |
|
|
2012 |
Aker Solution |
 |
|
|
2012 |
EMAS AMC |
 |
|
|
2012 |
Nexans |
 |
|
|
2012 |
Nexans |
 |
|
|
2012 |
Nexans |
 |
|
|
2012 |
Reef Subsea |
 |
|
|
2012 |
Technip |
 |
|
|
2012 |
Statnett |
 |
|
|
2012 |
Nexans |
 |
|
|
2012 |
Technip |
 |
Engineering assistance |
|
2012 |
ABB |
 |
Offshore marine operation - Engineering assistance |
|
2012 |
DeepOcean |
 |
Offshore marine operation - Project Engineer |
|
2012 |
DeepOcean |
 |
Design of test machine |
|
2012 |
Aker solutions AS |
 |
Trenching assessment |
|
2012 |
Facilium |
 |
Specification and evaluation of tenders |
|
2012 |
Kystverket |
 |
Upgrade of overhead crane |
|
2012 |
Mercur Solutions AS |
 |
Orcaflex analysis - mooring |
|
2012 |
Buksér og Berging |
 |
Dynamic analysis of ROV launch and recovery |
|
2012 |
IKM Subsea |
 |
Orcaflex analysis - mooring chain replacement |
|
2012 |
EMAS AMC |
 |
Marine Operation - Offshore engineer |
|
2012 |
DeepOcean |
 |
Temporary lifting clamp - design & fabrication |
|
2012 |
4Subsea AS |
 |
Supervision of pipeline replacement |
|
2012 |
Tristein AS |
 |
Strucural analysis |
|
2012 |
Mercur Solutions |
 |
Engineering design - cable joint support |
|
2012 |
Nexans Norway AS |
 |
Umbilical Plant - Engineering |
|
2012 |
Aker Solutions |
 |
Cable Installation - Orcaflex |
|
2011 |
Subsea 7 |
 |
Cable protection of FO cables |
|
2011 |
Telenor |
 |
Engineering calculation |
|
2011 |
Aker Solutions |
 |
Cable installation engineering- offshore wind park array cables |
|
2011 |
Nexans Norway AS |
 |
Cable installation engineering - subsea cable |
|
2011 |
Nexans Norway AS |
 |
A&R clamp for pipeline - design & Fabrication |
|
2011 |
Technip Norge AS |
 |
Engineering assistance |
|
2011 |
Statnett Transport |
 |
Enginering assistance - Tordis |
|
2011 |
Tampnet |
 |
X-mas tree carrier - engineering and calculation |
|
2011 |
Mercur Maritime |
 |
Umbilical Spread EPC |
|
2011 |
Technip Norge AS |
 |
Cable repair - engineering |
|
2011 |
Nexans Norway As |
 |
Skid pallets |
|
2011 |
Aker Oilfield Services |
 |
Emergency response plan |
|
2011 |
Statnett SF |
 |
Design of FO Clamp |
|
2011 |
Seaworks |
 |
Engineering consultancy |
|
2011 |
Aker Solutions |
 |
Engineering - pump module frame |
|
2011 |
Ocean Riser System |
 |
Engineering Assistance - Chute |
|
2011 |
Ingenium Kristiansand |
 |
Engineering |
|
2011 |
Aker Oilfield Services |
 |
Delivery og tower and clamps - riser repair |
|
2011 |
Technip Norge AS |
 |
QC of installation procedure - cable installation |
|
2011 |
Nexans Norway AS |
 |
Oil removal from shipwreck - Evaluation of proposals |
|
2011 |
Kystverket |
 |
Mobilisation assistance cable repair |
|
2011 |
Statnett Transport AS |
 |
Tender assistance |
|
2011 |
Statnett Transport AS |
 |
Tender assistance |
|
2011 |
Technip Norge AS |
 |
Installation analysis |
|
2011 |
Deep Ocean |
 |
Tractor units for pallets |
|
2011 |
Aker Oilfield Services |
 |
Seafastening verification |
|
2011 |
Noble Denton |
 |
Analysis for re-routing of flow-line |
|
2011 |
Deep Ocean |
 |
Statfjord C Removal of single bouy |
|
2011 |
Buksér og Berging |
 |
Tender Assistance |
|
2011 |
Statnett Transport |
 |
Engineering assistance, cable repair |
|
2011 |
Nexans Norway |
 |
Feasibility study for manipulator arm |
|
2011 |
Mercur Maritime |
 |
Supply of bendstiffeners and supervision |
|
2011 |
Total E & P Congo |
 |
Design study |
|
2011 |
Mercur Maritime |
 |
ScanCrawler animation, update |
|
2011 |
ScanMudring |
 |
Chute design verification |
|
2011 |
Nexans Norway |
 |
Engineering assistance, cable repair |
|
2011 |
Nexans Norway |
 |
Offshore IR wind guage station, drawing assistance |
|
2011 |
Fred Olsen |
 |
Engineering marine installation |
|
2010 |
Nexans Norway |
 |
Spare parts, Laser welding machine |
|
2010 |
JDR Marine Cables Holland |
 |
Design of fender system for personnel boats towards windturbine boat landing |
|
2010 |
Fred Olsen Windcarrier |
 |
Design and drawing fabrication for mezzanine deck |
|
2010 |
Aker Oilfield Services |
 |
Design and engineering for tractor system and pallet for coil tubing frame and SFT |
|
2010 |
Aker Oilfield Services |
 |
Design working deck and umbilical tension tool |
|
2010 |
Aker Oilfield Services |
 |
Static mooring analysis, Orcaflex |
|
2010 |
Buksér og Berging |
 |
Delivery of hydraulic components |
|
2010 |
Aker Oilfield Services |
 |
Engineering assistance trenching manuals |
|
2010 |
LD Travocean France |
 |
Nye ytre Oslofjord - survey |
|
2010 |
Nexans Norway |
 |
Feasability study - Mercury removal from submarine wreck using ROV |
|
2010 |
Kystverket |
 |
Spareparts, engineering assistance, service |
|
2010 |
WGP UK |
 |
Skagerak feasability study |
|
2010 |
Nexans Norway |
 |
New umbilical plant |
|
2010 |
Aker Solutions |
 |
Winch spooling gear calculations |
|
2010 |
Ingenium Kristiansand |
 |
Offshore on site supervision |
|
2010 |
Deep Ocean |
 |
Engineering assistance |
|
2010 |
Facilium |
 |
Modifications in acc. with NOFO spec. |
|
2010 |
Ingenium Kristiansand |
 |
Calculation for general port mooring + specific YME jack-up port mooring calculations |
|
2010 |
Buksér og Berging |
 |
Design of LRP umbilical launch frame |
|
2010 |
Aker Oilfield Services |
 |
Design/test of trenching construction adapted to Nexans Captrack system |
|
2010 |
Nexans Norway |
 |
Collapsible roof and table construction adapted to a Zodiac inflatable boat |
|
2010 |
Argus Remote Systems |
 |
Analyses of Tordis umbilical replacement job |
|
2010 |
Deep Ocean |
 |
Analyses of Heidrun re-routing job. |
|
2010 |
Deep Ocean |
 |
Detail engineering of ROV for IKM Subsea |
|
2010 |
IKM Subsea |
 |
Seawater snow melting processing plant on barge |
|
2010 |
NCC |
 |
Modification of exisiting cable submerging system on workboat |
|
2010 |
Nexans Norway |
 |
Assistance of SAT design and installation method |
|
2010 |
Facilium |
 |
Orcaflex analyses of riser pull outfrom template location |
|
2010 |
Deep Ocean |
 |
Temporary support clamps |
|
2010 |
Acergy |
 |
Review of tenders for cable installation |
|
2010 |
Aker Marine Contractors |
 |
NorNed cable repair 2010. EPC-delivery of cable drum assembly. |
|
2010 |
Statnett |
 |
FLP Draugen mooring analysis. Static and dynamic mooring analysis, OrcaFlex |
|
2010 |
Bukser & Berging |
 |
Produce documentation for operation of the ROV WR200. |
|
2010 |
IKM Subsea |
 |
Dummy CTTF test frame - EPC delivery, clump weight basket and C-plate |
|
2010 |
Aker Oilfield Services |
 |
Cable handling calculations - Installation and repair |
|
2009 |
Deep Ocean |
 |
Mobilisation of trenching support vessel, Elektron |
|
2009 |
Nexans Norway |
 |
Engineering study |
|
2009 |
Aker Marine Contractors |
 |
USA LIRC submarine power cable project. Vessel mobilisation and repair marine engineering. |
|
2009 |
Nexans Norway |
 |
Deep sea atlantic drill rig. Pre-engineering for x-mas tree handling on board DSA. |
|
2009 |
Odfjel Drilling Technology and Mercur Maritime |
 |
Marine installation engineering |
|
2009 |
Aker Marine Contractors |
 |
Engineering management of vessel conversion |
|
2009 |
Aker Oilfield Services |
 |
Orcaflex umbilical installation analysis. |
|
2009 |
Deep Ocean |
 |
Offshore site supervision |
|
2009 |
Deep Ocean |
 |
Dynamical lifting analysis for 70 Te module on vessel Edda Fauna |
|
2009 |
Deep Ocean |
 |
Statfjord. Offshore loading system hoses. Design of complete vessel handlingsystem for hose replacement |
|
2009 |
Deep Ocean |
 |
Kristin. Design and supply of lifting frames for lifting of Kristin risers during installation of wedges to mitigate anchor wear. |
|
2009 |
Technip Norge AS |
 |
Design of X-mas tree handling system. |
|
2009 |
Mecur Maritime |
 |
Design of cable retrieval mechanism for submerged power cable. |
|
2009 |
Nexans Norway |
 |
Alpha Ventus offshore wind farm project. design of seafastening of jackets, vessel stability and transportation manuals. |
|
2009 |
Norwind |
 |
Kristin riser protection project. Design and supply of PUR wedges for riser protection. |
|
2009 |
Technip Norge AS |
 |
Submarine power cable lay/repair. Design of submarine power cable lay chute. |
|
2009 |
Nexans Norway |
 |
Design and supply of temporary support clamps |
|
2009 |
Acergy |
 |
Provision of 2nd ROV installable riser clamp. Refurbishment of existing. |
|
2009 |
Technip Norge AS |
 |
Design and supply of deck handling system for Optowave OBC. Drom initial concept review to final delivery. |
|
2009 |
Optoplan AS |
 |
Stingray FOSAR Test Cable Installation |
|
2008 |
Bergen Oilfield Services |
 |
Design and fabrication of constant tension ROV umbilical loading system |
|
2008 |
Deep Ocean |
 |
Design of equipment for Kittiwake Loading Buoy Decommissioning |
|
2008 |
Deep Ocean |
 |
Fabrication of Diverless Latch Assembly |
|
2008 |
Technip |
 |
EPC Insulating Fluid Pumping Stations for Hainan, China |
|
2008 |
Nexans |
 |
EPC ROV Umbilical tensioner |
|
2008 |
Deep Ocean |
 |
EPC ROV Installable Riser Holdback Clamp |
|
2008 |
Technip |
 |
Vacuna 2000 Beach Cleaning Equipment |
|
2008 |
Mercur Maritime ENI |
 |
Design of Xmas tree skidding system for Transocean Searcher |
|
2008 |
Mercur Maritime Grenland Group |
 |
Design of Rem Etive Sheave and Winch foundations |
|
2007 |
Deep Ocean |
 |
Morsa West, Angola Cable and Umbilical Installation Project |
|
2007 |
CECON |
 |
ScanCrawler Animation |
|
2007 |
ScanMudring |
 |
Veslefrikk A HTV Arm modification |
|
2007 |
Mercur/STATOIL |
 |
Power Cable Automatic Jointing Machine |
|
2007 |
Nexans |
 |
Mud Return Gutter for Veslefrikk |
|
2007 |
Mercur/Statoil |
 |
Turntable Concept Study |
|
2007 |
Volker Stevin / Visser & Smit Hanab |
 |
Holdback Clamps for Kristin Riser Repairs |
|
2007 |
Bjørge/STATOIL |
 |
Reel seafastening |
|
2007 |
Acergy |
 |
Umbilical installation and repair - Dolphin |
|
2007 |
Nexans |
 |
NorNed power cable installation anaysis |
|
2007 |
Statnett |
 |
Cradles and Baskets for Åsgard Repair |
|
2007 |
Technip |
 |
Installation of On Bottom Seismic cables in the Caspian Sea |
|
2006 |
BP Exploration |
 |
Power Cable Automatic Jointing Machine |
|
2006 |
Nexans |
 |
NorNed Cable Lay Verification |
|
2006 |
Stantnett |
 |
EPC contract for supply of gas lift manifolds |
|
2006 |
Anonymous |
 |
Alvheim Well Protection |
|
2005 |
Technip |
 |
Morsa West, Angola Pipeline Installation |
|
2005 |
CECON |
 |
The SNAP-ON cable protection system is a new product fr... |
|
2005 |
Telenor |
 |
Laying equipment for Snøhvit |
|
2005 |
Technip |
 |
Kristin riser bases |
|
2004 |
Aker Kvaerner |
 |
A&R clamps on the Kristin field |
|
2004 |
Technip |
 |
Saudi Aramco - Umbilical Installation |
|
2004 |
Nexans |
 |
Njord riser repair |
|
2004 |
Technip |
 |
Åsgard riser and flowline replacement |
|
2003 |
Technip |
 |
Latch Animation |
|
2003 |
Imenco |
 |
Vallhall LoFs |
|
2003 |
Facilium |
 |
Vallhall LoFs - supply og cable laying equipment |
|
2003 |
Subsea7 |
 |
TMS |
|
2003 |
Bennex |
 |
Cathode Carbon Block Steel Bar Preheater |
|
2002 |
Almeq |
 |
Tool support basket |
|
2002 |
Nemo |
 |
KOP Umbilical factory, Alabama |
|
2002 |
Aker Kvaerner |
 |
Norne GIC repair |
|
2002 |
Technip |
 |
Environmental dredging |
|
2001 |
NCC |