Project Year Client
2013 Nexans
2012 Buksér og Berging
2012 Technip
2012 Wärtsilä
2012 Aker Solution
2012 EMAS AMC
2012 Nexans
2012 Nexans
2012 Nexans
2012 Reef Subsea
2012 Technip
2012 Statnett
2012 Nexans
2012 Technip
Engineering assistance 2012 ABB
Offshore marine operation - Engineering assistance 2012 DeepOcean
Offshore marine operation - Project Engineer 2012 DeepOcean
Design of test machine 2012 Aker solutions AS
Trenching assessment 2012 Facilium
Specification and evaluation of tenders 2012 Kystverket
Upgrade of overhead crane 2012 Mercur Solutions AS
Orcaflex analysis - mooring 2012 Buksér og Berging
Dynamic analysis of ROV launch and recovery 2012 IKM Subsea
Orcaflex analysis - mooring chain replacement 2012 EMAS AMC
Marine Operation - Offshore engineer 2012 DeepOcean
Temporary lifting clamp - design & fabrication 2012 4Subsea AS
Supervision of pipeline replacement 2012 Tristein AS
Strucural analysis 2012 Mercur Solutions
Engineering design - cable joint support 2012 Nexans Norway AS
Umbilical Plant - Engineering 2012 Aker Solutions
Cable Installation - Orcaflex 2011 Subsea 7
Cable protection of FO cables 2011 Telenor
Engineering calculation 2011 Aker Solutions
Cable installation engineering- offshore wind park array cables 2011 Nexans Norway AS
Cable installation engineering - subsea cable 2011 Nexans Norway AS
A&R clamp for pipeline - design & Fabrication 2011 Technip Norge AS
Engineering assistance 2011 Statnett Transport
Enginering assistance - Tordis 2011 Tampnet
X-mas tree carrier - engineering and calculation 2011 Mercur Maritime
Umbilical Spread EPC 2011 Technip Norge AS
Cable repair - engineering 2011 Nexans Norway As
Skid pallets 2011 Aker Oilfield Services
Emergency response plan 2011 Statnett SF
Design of FO Clamp 2011 Seaworks
Engineering consultancy 2011 Aker Solutions
Engineering - pump module frame 2011 Ocean Riser System
Engineering Assistance - Chute 2011 Ingenium Kristiansand
Engineering 2011 Aker Oilfield Services
Delivery og tower and clamps - riser repair 2011 Technip Norge AS
QC of installation procedure - cable installation 2011 Nexans Norway AS
Oil removal from shipwreck - Evaluation of proposals 2011 Kystverket
Mobilisation assistance cable repair  2011 Statnett Transport AS
Tender assistance 2011 Statnett Transport AS
Tender assistance 2011 Technip Norge AS
Installation analysis 2011 Deep Ocean
Tractor units for pallets 2011 Aker Oilfield Services
Seafastening verification 2011 Noble Denton
Analysis for re-routing of flow-line 2011 Deep Ocean
Statfjord C Removal of single bouy 2011 Buksér og Berging
Tender Assistance 2011 Statnett Transport
Engineering assistance, cable repair 2011 Nexans Norway
Feasibility study for manipulator arm 2011 Mercur Maritime 
Supply of bendstiffeners and supervision 2011 Total E & P Congo
Design study 2011 Mercur Maritime 
ScanCrawler animation, update 2011 ScanMudring
Chute design verification 2011 Nexans Norway
Engineering assistance, cable repair 2011 Nexans Norway
Offshore IR wind guage station, drawing assistance 2011 Fred Olsen
Engineering marine installation 2010 Nexans Norway
Spare parts, Laser welding machine 2010 JDR Marine Cables Holland
Design of fender system for personnel boats towards windturbine boat landing 2010 Fred Olsen Windcarrier
Design and drawing fabrication for mezzanine deck 2010 Aker Oilfield Services
Design and engineering for tractor system and pallet for coil tubing frame and SFT 2010 Aker Oilfield Services
Design working deck and umbilical tension tool 2010 Aker Oilfield Services
Static mooring analysis, Orcaflex 2010 Buksér og Berging
Delivery of hydraulic components 2010 Aker Oilfield Services
Engineering assistance trenching manuals 2010 LD Travocean France
Nye ytre Oslofjord - survey 2010 Nexans Norway
Feasability study - Mercury removal from submarine wreck using ROV 2010 Kystverket
Spareparts, engineering assistance, service 2010 WGP UK
Skagerak feasability study 2010 Nexans Norway
New umbilical plant 2010 Aker Solutions
Winch spooling gear calculations 2010 Ingenium Kristiansand
Offshore on site supervision 2010 Deep Ocean
Engineering assistance 2010 Facilium
Modifications in acc. with NOFO spec. 2010 Ingenium Kristiansand
Calculation for general port mooring + specific YME jack-up port mooring calculations 2010 Buksér og Berging
Design of LRP umbilical launch frame 2010 Aker Oilfield Services
Design/test of trenching construction adapted to Nexans Captrack system 2010 Nexans Norway
Collapsible roof and table construction adapted to a Zodiac inflatable boat 2010 Argus Remote Systems
Analyses of Tordis umbilical replacement job 2010 Deep Ocean
Analyses of Heidrun re-routing job. 2010 Deep Ocean
Detail engineering of ROV for IKM Subsea 2010 IKM Subsea
Seawater snow melting processing plant on barge 2010 NCC
Modification of exisiting cable submerging system on workboat 2010 Nexans Norway
Assistance of SAT design and installation method 2010 Facilium
Orcaflex analyses of riser pull outfrom template location 2010 Deep Ocean
Temporary support clamps 2010 Acergy
Review of tenders for cable installation 2010 Aker Marine Contractors
NorNed cable repair 2010. EPC-delivery of cable drum assembly. 2010 Statnett
FLP Draugen mooring analysis. Static and dynamic mooring analysis, OrcaFlex 2010 Bukser & Berging
Produce documentation for operation of the ROV WR200. 2010 IKM Subsea
Dummy CTTF test frame - EPC delivery, clump weight basket and C-plate 2010 Aker Oilfield Services
Cable handling calculations - Installation and repair 2009 Deep Ocean
Mobilisation of trenching support vessel, Elektron 2009 Nexans Norway
Engineering study 2009 Aker Marine Contractors
USA LIRC submarine power cable project. Vessel mobilisation and repair marine engineering. 2009 Nexans Norway
Deep sea atlantic drill rig. Pre-engineering for x-mas tree handling on board DSA. 2009 Odfjel Drilling Technology and Mercur Maritime
Marine installation engineering 2009 Aker Marine Contractors
Engineering management of vessel conversion 2009 Aker Oilfield Services
Orcaflex umbilical installation analysis. 2009 Deep Ocean
Offshore site supervision 2009 Deep Ocean
Dynamical lifting analysis for 70 Te module on vessel Edda Fauna 2009 Deep Ocean
Statfjord. Offshore loading system hoses. Design of complete vessel handlingsystem for hose replacement 2009 Deep Ocean
Kristin. Design and supply of lifting frames for lifting of Kristin risers during installation of wedges to mitigate anchor wear. 2009 Technip Norge AS
Design of X-mas tree handling system. 2009 Mecur Maritime
Design of cable retrieval mechanism for submerged power cable. 2009 Nexans Norway
Alpha Ventus offshore wind farm project. design of seafastening of jackets, vessel stability and transportation manuals. 2009 Norwind
Kristin riser protection project. Design and supply of PUR wedges for riser protection.  2009 Technip Norge AS
Submarine power cable lay/repair. Design of submarine power cable lay chute. 2009 Nexans Norway
Design and supply of temporary support clamps 2009 Acergy
Provision of 2nd ROV installable riser clamp. Refurbishment of existing. 2009 Technip Norge AS
Design and supply of deck handling system for Optowave OBC. Drom initial concept review to final delivery. 2009 Optoplan AS
Stingray FOSAR Test Cable Installation 2008 Bergen Oilfield Services
Design and fabrication of constant tension ROV umbilical loading system 2008 Deep Ocean
Design of equipment for Kittiwake Loading Buoy Decommissioning 2008 Deep Ocean
Fabrication of Diverless Latch Assembly 2008 Technip
EPC Insulating Fluid Pumping Stations for Hainan, China 2008 Nexans
EPC ROV Umbilical tensioner 2008 Deep Ocean
EPC ROV Installable Riser Holdback Clamp 2008 Technip
Vacuna 2000 Beach Cleaning Equipment 2008

Mercur Maritime
ENI

Design of Xmas tree skidding system for Transocean Searcher 2008 Mercur Maritime
Grenland Group

Design of Rem Etive Sheave and Winch foundations

2007 Deep Ocean

Morsa West, Angola Cable and Umbilical Installation Project

2007 CECON
ScanCrawler Animation 2007 ScanMudring
Veslefrikk A HTV Arm modification 2007 Mercur/STATOIL
Power Cable Automatic Jointing Machine 2007 Nexans
Mud Return Gutter for Veslefrikk 2007 Mercur/Statoil
Turntable Concept Study 2007 Volker Stevin /
Visser & Smit Hanab
Holdback Clamps for Kristin Riser Repairs 2007 Bjørge/STATOIL
Reel seafastening 2007 Acergy
Umbilical installation and repair - Dolphin 2007 Nexans
NorNed power cable installation anaysis 2007 Statnett
Cradles and Baskets for Åsgard Repair 2007 Technip
Installation of On Bottom Seismic cables in the Caspian Sea 2006 BP Exploration
Power Cable Automatic Jointing Machine 2006 Nexans
NorNed Cable Lay Verification 2006 Stantnett
EPC contract for supply of gas lift manifolds 2006 Anonymous
Alvheim Well Protection 2005 Technip
Morsa West, Angola Pipeline Installation 2005 CECON
The SNAP-ON cable protection system is a new product fr... 2005 Telenor
Laying equipment for Snøhvit 2005 Technip
Kristin riser bases 2004 Aker Kvaerner
A&R clamps on the Kristin field 2004 Technip
Saudi Aramco - Umbilical Installation 2004 Nexans
Njord riser repair 2004 Technip
Åsgard riser and flowline replacement 2003 Technip
Latch Animation 2003 Imenco
Vallhall LoFs 2003 Facilium
Vallhall LoFs - supply og cable laying equipment 2003 Subsea7
TMS 2003 Bennex
Cathode Carbon Block Steel Bar Preheater 2002 Almeq
Tool support basket 2002 Nemo
KOP Umbilical factory, Alabama 2002 Aker Kvaerner
Norne GIC repair 2002 Technip
Environmental dredging 2001 NCC
a